联系我们

公司名称:XXX

电话:XXX

手机:XXX

联系人:XXX

地址:XXX

新闻动态
选好了防水涂料,并不代表家装防水就万无一失
选好了防水涂料,并不代表家装防水就万无一失。俗话说“三分材料,七分施工”,倘若在施工的时候出现差错,将带来很大麻烦。因此,有必要了解一下防水涂料施工的规范流程,不管是自装还是请人施工,都能将漏水风险减到最低。
Choose a good waterproof coating, does not mean that the home decoration waterproof is infallible. As the saying goes, "three points of materials, seven points of construction", if there are errors in the construction, it will bring great trouble. Therefore, it is necessary to understand the standard process of waterproof coating construction, whether self-assembly or construction, can reduce the risk of water leakage to the minimum.
一、施工准备:做好基层处理
1、 Construction preparation: base treatment
防水基层要求:在防水施工前要做好墙体、地面的基层处理,要确保基层表面坚实、无开裂、粉化、脱皮、起鼓等现象。同时基层表面必须清洁、无灰尘、脱膜剂等影响涂料粘结的任何杂物污迹。
Requirements for waterproof base: before waterproof construction, the base treatment of wall and ground should be done well, and the surface of base course should be solid without cracking, powdering, peeling and bulging. At the same time, the surface of the base course must be clean and free of dust, film remover and other impurities that affect the adhesion of the coating.
基层处理方法:一般先仔细清扫基面去除浮尘,并去除水泥结块和松动基层;对管根、排水孔、阴阳角、墙面水电改后留下的空洞等部位进纤维 驱鸟设备 保定通风管道 塑料土工格栅 检查井模具 流水槽模具 锻造厂家 华尔街铜牛行特殊处理,阴阳角处应抹成圆弧形(或V字型)。不平、开裂的部分,需要重新修复,并找平。
Base treatment method: generally, the base surface shall be carefully cleaned to remove floating dust, and cement caking and loose base course shall be removed; special treatment shall be carried out for pipe root, drainage hole, internal and external corners, cavity left after water and electricity transformation on the wall surface, and the internal and external corners shall be plastered in arc shape (or V-shaped). The uneven and cracked parts need to be repaired and leveled.

联系方式

  1. 公司名称:XXX
  2. 电话:XXX
  3. 手机:XXX
  4. 联系人:XXX
  5. 地址:XXX

版权 © 秦皇岛市防水材料厂 网址:qhdfangshui.75ix.com  推荐:秦皇岛防水施工,秦皇岛防水材料,秦皇岛市做防水工程

网站建设及优化保定遨游网络公司