防水涂料的检查
添加时间:2019/10/31 16:12:15     浏览次数:
防水涂料养护:施工24小时后建议用湿布覆盖涂层或喷雾洒水对涂层进行养护。
Maintenance of waterproof coating: after 24 hours of construction, it is recommended to use wet cloth to cover the coating or spray spray to maintain the coating.
防水涂料保护:施工后完全干固前请采取禁止踩踏、雨水、暴晒、尖锐损伤等保护。
Waterproof coating protection: please take protection measures such as no trampling, rain, exposure to the sun, sharp damage, etc. before fully dry and solid after construction.
防水涂料检查(闭水试验):卫生间、水池等部位请在防水层干固后(夏天至少24小时,冬天至少48小时)储满水48小时以检查防水施工是否合格。轻质墙体须做淋水试验。
Inspection of waterproof coating (closed water test): the toilet, pool and other parts shall be filled with water for 48 hours after the waterproof layer is dried and fixed (at least 24 hours in summer and 48 hours in winter) to check whether the waterproof construction is qualified. Water spraying test shall be conducted for light wall.
上一页  高弹防水涂料是以高档丙烯酸乳液为基料  
下一页  卫生间防水技巧
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3